skip to Main Content

Week 5 day 33

Today we have been working on our vision system and currently have three cameras up and running. The gear mechanism is currently being strengthen and rebuilt. In terms of electronics we have been lengthening encoder wires and installing and prepping them. We have 3D printed the third iteration of our climber grabber outline.

Back To Top